Awaran–Jhal Jhao Road
CPEC Central Alignment, South Balochistan
- Date
- 2026
- Location
- South Balochistan

Rehabilitation and up-gradation of the 54.80 km Awaran–Jhal Jhao Road under the CPEC central alignment, a joint venture structured by HKH.
Overview
Rehabilitation and up-gradation of the 54.80 km long Awaran–Jhal Jhao Road — a critical infrastructure initiative under the China-Pakistan Economic Corridor (CPEC) central alignment in South Balochistan, executed by the ZIEC-PTA joint venture. HKH (Pvt) Ltd provided consultancy service for the formation of the joint venture delivering this package.
Package Details
- 55 km section length awarded by the National Highway Authority
- Rs 5.15 bn contract value
- ZIEC / PTA — Zhongding International Engineering Co. and Progressive Technical Associates
Works
Excavation and earthworks along the alignment, hill cutting, rock excavation at the cut face, and formation-level work.