Project
Hyderabad–Sukkur M-6 Motorway
306 km, six-lane motorway — Sections 3, 4 & 5
- Date
- 2026
- Location
- Sindh

Construction of the Hyderabad–Sukkur six-lane motorway, with HKH's Managing Director acting as Authorised Representative for the international lead contractors on three sections.
Overview
Construction of the Hyderabad–Sukkur 306 km, six-lane motorway. HKH provided consultancy for the formation of the joint venture between Xingtai Road & Bridge Construction Group and Progressive Technical Associate Private Limited. Captain Abdul Khaliq Khar, MD of HKH Pvt Ltd, acts as Authorised Representative in Pakistan for Xingtai Road & Bridge Construction Group.
Sections Delivered
- Section 4 — Padidan (Noushero Feroz) to Ranipur, 60.90 km
- Section 5 — Ranipur to Sukkur, 59.88 km
- Section 3 — Nawabshah to Naushahro Feroz, Km 250+500 to Km 315+300, approximately 64.61 km, delivered through the SAMA Construction for Trading and Contracting (C.J.S. Co.) joint venture
Joint Venture Structure (Sections 4 & 5)
- Lead Contractor: Xingtai Road & Bridge Construction Group Co., Ltd — China
- Pakistani Partner: Progressive Technical Associate Private Limited
- Authorised Representative: Capt. Abdul Khaliq Khar, Managing Director, HKH Pvt Ltd
- Client: National Highway Authority, Government of Pakistan
Joint Venture Structure (Section 3)
- Lead Contractor: SAMA Construction for Trading and Contracting (C.J.S. Co.) — Riyadh
- Pakistani Partner: Progressive Technical Associate Private Limited
- Chairman & CEO: Mr. Sultan Salman Saleem Al Saedi
Signed Authority
Powers of attorney dated 26 January 2026 (Xingtai, Sections 4 & 5) and an authority letter dated 7 July 2026, attested by the Ministry of Foreign Affairs of Saudi Arabia and the Embassy of Pakistan in Riyadh (SAMA, Section 3), appointed Captain Abdul Khaliq Rabbani Khar to negotiate, sign and submit joint venture agreements and bids to the NHA on the respective partners' behalf.
Continue


