Project
N-5 Reconstruction — Ranipur to Rohri
Pakistan Resilient Recovery, Rehabilitation and Reconstruction Framework Project, Phase IA
- Date
- 2026
- Location
- Sindh

Reconstruction of a 70 km section of National Highway N-5 between Ranipur and Rohri, with HKH's Managing Director serving as Authorised Representative for the Riyadh-based lead contractor.
Overview
Reconstruction of National Highway N-5 under the Pakistan Resilient Recovery, Rehabilitation and Reconstruction Framework Project — Phase IA (141 km), Section 2: Ranipur–Rohri Road. HKH provided consultancy for formation of the joint venture between SAMA Construction for Trading and Contracting (C.J.S. Co.) and Progressive Technical Associate Private Limited.
Package Details
- 141 km — Phase IA framework project
- 70 km — Section 2: Ranipur–Rohri Road
Joint Venture Structure
- Lead Contractor: SAMA Construction for Trading and Contracting (C.J.S. Co.) — Riyadh
- Pakistani Partner: Progressive Technical Associate Private Limited
- Authorised Representative: Capt. Abdul Khaliq Khar, Managing Director, HKH Pvt Ltd
- Framework: Pakistan Resilient Recovery, Rehabilitation and Reconstruction Framework Project
Captain Abdul Khaliq Khar serves as SAMA's Authorised Representative in Pakistan for this package.